Sections
Home : Library : Studies : US 6 Clifton Access Control Plan
Bookmark and Share

Skip to content. | Skip to navigation

US 6 Clifton Access Control Plan

Region 3 of the Colorado Department of Transportation (CDOT) and Mesa County have identified a need to improve future traffic operations on US 6 between the I-70 Business Loop and the railroad viaduct east of 33 Road by developing an access management plan (AMP) . This ACP evaluated the portion of the US 6 corridor located from the Interstate 70 (I-70) Business Loop to the viaduct over the Union Pacific Railroad east of 33 Road. Keywords: Studies, US Highways

Appendix A

Existing Access Locations (Map)

Read More…

Appendix B

Access Control Map

Read More…

Appendix C

Access Control Plan Table

Read More…

Appendix D

Intergovernmental Agreement

Read More…

Appendix F

Average Daily Traffic Counts

Read More…

Appendix G

Peak Hour Turning Movement Counts

Read More…

Appendix H

Existing Conditions Level of Service

Read More…

Appendix J

2035 No Action Level of Service

Read More…

Appendix K

First Open House Summary Report

Read More…

Appendix L

2nd Open House Summary Report

Read More…

Appendix M

Final Open House Summary Report

Read More…

Appendix N

2035 Build Level of Service

Read More…

Document Actions
Contact Information

Alisa Babler, P.E.
Permit Engineer
CDOT, Region 3
222 South 6th Street, Room 100
Grand Junction, CO 81501
alisa.babler@dot.state.co.us

 
Personal tools