Tentative Project Schedule

This is a tentative schedule of construction activities.

 

2014 Winter Schedule

  • Final completion work on Wadsworth Parkway
  • Continue paving and grading throughout US 36 corridor
  • Realign traffic onto new southbound Sheridan bridge, demolish old structure and reconstruct on-and off-ramps
  • Complete noise wall installation on eastbound US 36 between Sheridan and Federal Boulevard
  • Complete critical drainage installation on entire project
  • Pour the deck on the US bridge over Lowell Boulevard

 

March 2014 to August 2014 McCaslin Boulevard Activities

  • Barrier placement-Concrete removal
  • Roadway removal
  • Shifting traffic to the southbound side of McCaslin
  • Temporary sign installations
  • Asphalt paving

 

Additional Phase 2 Activities:

  • Continue earthmoving and dirt hauling activities
  • Utility bridge demolition
  • Installation of new utility bridge
  • Temporary pavement installation
  • Installation of irrigation crossings
  • Realign traffic to the eastbound lanes between McCaslin and 88th
  • Continue to set temporary barrier