4th Street Bridge
-
The existing 4th St. Bridge, structure number K-18-Z, has a Sufficiency Rating of 24 out of 100 and has become structurally deficient and functionally obsolete. Improvements will be made to enhance safety for motorists and pedestrians through new bridge construction and approach roadway modifications. Roadway alignment and profile improvements, structure replacement, drainage design, lighting, and urban design are part of the final overall strategy. Keywords: Active Construction, State Highways
-
I-25 at Alameda Avenue/Santa Fe Drive
-
Replaces the Alameda bridge over I-25 with one that is wider to accommodate an additional lane in each direction. Keywords: Active Construction, Interstates
-
I-25 Through Trinidad
-
Constructs the Purgatoire River Pedestrian Trail, adds street lights, parking lot paving, curb and gutter, drainage inlets, landscaping and sidewalk. This work will be added onto the existing contract for work taking place on I-25 through Trinidad. Keywords: Active Construction, Interstates
-
I-25, US 36 and C-470
-
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470. Keywords: Active Construction, Interstates, US Highways
-
Northern Avenue Trail Enhancement
-
Pedestrian trail replacement and streetscape on Northern Avenue from Vinewood Lane to Prairie Avenue. Keywords: Active Construction
-
US 24 East Bridge over Draw in Falcon, east of Colorado Springs
-
Replaces a structurally deficient bridge in Falcon and improves drainage. Keywords: Active Construction, US Highways
-
US 50 east of Pueblo
-
Resurfaces six miles of US 50 and makes some other improvements. Keywords: Active Construction, US Highways
-
US 287 south of Springfield (Ports to Plains Corridor)
-
This project will reconstruct US 287 in concrete and improve drainage and shoulder embankments. The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways