Southeastern Colorado

Southeastern Colorado - Region 2 Active Construction

Folder 4th Street Bridge
The existing 4th St. Bridge, structure number K-18-Z, has a Sufficiency Rating of 24 out of 100 and has become structurally deficient and functionally obsolete. Improvements will be made to enhance safety for motorists and pedestrians through new bridge construction and approach roadway modifications. Roadway alignment and profile improvements, structure replacement, drainage design, lighting, and urban design are part of the final overall strategy. Keywords: Active Construction, State Highways
Folder I-25 at Alameda Avenue/Santa Fe Drive
Replaces the Alameda bridge over I-25 with one that is wider to accommodate an additional lane in each direction. Keywords: Active Construction, Interstates
Folder I-25 Through Trinidad
Constructs the Purgatoire River Pedestrian Trail, adds street lights, parking lot paving, curb and gutter, drainage inlets, landscaping and sidewalk. This work will be added onto the existing contract for work taking place on I-25 through Trinidad. Keywords: Active Construction, Interstates
Folder I-25, US 36 and C-470
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470. Keywords: Active Construction, Interstates, US Highways
Folder Northern Avenue Trail Enhancement
Pedestrian trail replacement and streetscape on Northern Avenue from Vinewood Lane to Prairie Avenue. Keywords: Active Construction
Folder US 24 East Bridge over Draw in Falcon, east of Colorado Springs
Replaces a structurally deficient bridge in Falcon and improves drainage. Keywords: Active Construction, US Highways
Folder US 50 east of Pueblo
Resurfaces six miles of US 50 and makes some other improvements. Keywords: Active Construction, US Highways
Folder US 287 south of Springfield (Ports to Plains Corridor)
This project will reconstruct US 287 in concrete and improve drainage and shoulder embankments. The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways
Personal tools