Denver Metro Area

Denver Metro Area - Region 6 Active Construction

Folder 80th Avenue over US 36
Keywords: Active Construction, US Highways
Folder 120th Avenue Connection
The Colorado Department of Transportation, in partnership with the City and County of Broomfield, proposes to extend 120th Avenue from Wadsworth Parkway, across U.S. 36 to approximately 120th Avenue and Teller Street, including an intersection with U.S. 287. Keywords: Active Construction, State Highways
Folder C-470 between I-25 to Santa Fe Drive
Repairs or replaces concrete slabs on C-470 and resurfaces C-470 in asphalt. Rehabilitates the C-470 bike path between I-70 and I-25. Keywords: Active Construction, Interstates
Folder C-470/US 85 (Santa Fe Drive) Interchange
Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility. Keywords: Active Construction, Interstates
Folder Colorado Blvd. between Alameda Ave and Martin Luther King Blvd.
In early June 2010, the Colorado Department of Transportation (CDOT) will begin a surface treatment project on Colorado Boulevard between Alameda Avenue and Martin Luther King Jr. Boulevard. Keywords: Active Construction, State Highways
Folder I-25 and 104th Avenue Interchange
On July 6, 2009, the Colorado Department of Transportation (CDOT), in partnership with Existing 104th Bridge the City of Northglenn, will begin a bridge replacement project at I-25 and 104th Avenue. The project will replace the existing 104th Avenue bridge over I-25, which was originally constructed in 1962 and is one of Colorado's structurally deficient bridges. Keywords: Active Construction, Interstates
Folder I-25 at Alameda Avenue/Santa Fe Drive
Replaces the Alameda bridge over I-25 with one that is wider to accommodate an additional lane in each direction. Keywords: Active Construction, Interstates
Folder I-25 between 6th Avenue and 23rd Avenue
Resurfaces approximately three miles of I-25 in asphalt. Keywords: Active Construction, Interstates
Folder I-25, US 36 and C-470
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470. Keywords: Active Construction, Interstates, US Highways
Folder I-70 and SH 58 Interchange Project
A Colorado Department of Transportation (CDOT) interchange improvement project at I-70 and State Highway 58 in order to improve access. The project will construct two new ramps and reconstruct or realign three other ramps. Keywords: Active Construction, Interstates
Folder I-70 between Kipling Street and Wadsworth Boulevard
Repairs or replaces concrete slabs for approximately three miles of I-70. Keywords: Active Construction, Interstates
Folder I-70 between Pena Boulevard and Tower Road
Installs median cable guardrail to prevent crossover accidents. Keywords: Active Construction, Interstates
Folder I-70 Viaduct Expansion Joint Repairs
A Colorado Department of Transportation (CDOT) I-70 Viaduct Repairs expansion joint repair project on the I-70 viaduct from Brighton Boulevard to Colorado Boulevard. The project will repair or replace 60 bridge expansion joints on the 45-year old structure, improve drainage and replace the bridge rail. Keywords: Active Construction, Interstates
Folder I-76 at 96th Avenue
Constructs roundabouts at this interchange. Keywords: Active Construction, Interstates
Folder I-76 over UPRR and State Highway 224
Replaces two bridges on I-76. Keywords: Active Construction, Interstates, State Highways
Folder I-225 Widening
Interstate widening from Mississippi Ave. to north of 2nd Keywords: Active Construction, Interstates
Folder Parker Road and Arapahoe Road Interchange
The Parker Road (SH 83) and Arapahoe Road (SH 88) Interchange project will build an urban grade separated interchange at the intersection of the two state highways. Keywords: Active Construction, State Highways
Folder State Highway 2 between 62nd Avenue and Quebec Parkway
Resurfaces 2.4 miles in asphalt. Keywords: Active Construction, State Highways
Folder State Highway 88 (Arapahoe Rd) and I-25 Interchange
In August 2009, CDOT will begin a safety and capacity improvement project on Arapahoe Road between Yosemite Street and Boston/Clinton Street. The project will add an additional through lane in each direction underneath the structure by utilizing the existing on-ramp roadway. Keywords: Active Construction, State Highways
Folder State Highway 88 (Belleview) between Federal Boulevard and US 85 (Santa Fe Drive)
Resurfaces approximately one mile off SH 88 in asphalt. Keywords: Active Construction, State Highways, US Highways