US Highways

Active US Highway Construction Projects

Folder I-25, US 36 and C-470
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470. Keywords: Active Construction, Interstates, US Highways
Folder I-70/State Highway 82/US 6 at the Glenwood Springs Interchange (#116)
This safety improvement project will upgrade traffic signals and improve ramp width and length to benefit both pedestrians and vehicles. Keywords: Active Construction, Interstates, US Highways, State Highways
Folder State Highway 62, Dallas Divide between Ridgway and Telluride
Bid savings allowed for the project to be increased to resurface a total of 21.5 miles of SH 62 in asphalt and repair embankments. Project includes some work on US 550 as well. Keywords: Active Construction, State Highways
Folder State Highway 88 (Belleview) between Federal Boulevard and US 85 (Santa Fe Drive)
Resurfaces approximately one mile off SH 88 in asphalt. Keywords: Active Construction, State Highways, US Highways
Folder US 6 between Washington/Morgan County Line to the Platte River Bridges
Resurfaces nine miles of US 6 in asphalt and upgrades guardrail and culverts. Keywords: Active Construction, US Highways
Folder US 6, State Highway 93, State Highway 58 (one intersection in Golden) and State Highway 128 at Simms Street
Replaces traffic signals at two locations. Keywords: Active Construction, US Highways, State Highways
Folder US 24 East Bridge over Draw in Falcon, east of Colorado Springs
Replaces a structurally deficient bridge in Falcon and improves drainage. Keywords: Active Construction, US Highways
Folder US 24 west of Limon
Resurfaces 10.8 miles of US 24 in asphalt. Keywords: Active Construction, US Highways
Folder US 24/US 285 near Johnson Village
Reconstructs 11 miles of eastbound I-76 in concrete. Keywords: Active Construction, US Highways
Folder US 34 at Weld County Road 49
Installs a new traffic signal at this intersection. Keywords: Active Construction, US Highways
Folder US 34 between Brush and Akron
Chip seals 15 miles of US 34. Keywords: Active Construction, US Highways
Folder US 34 Truss Bridge Replacement
The Colorado Department of Transportation (CDOT) will soon begin a bridge replacement project on US 34 just east of Estes Park. The project will replace two structurally deficient bridges in the Big Thompson Canyon between mileposts 65.4 and 66.3. Keywords: Active Construction, US Highways
Folder US 36 at Broadway in Boulder
Installs a new traffic signal at this intersection. Keywords: Active Construction, US Highways
Folder US 36 between Estes Park and Lyons
Chip seals 22 miles of US 36 to improve the roadway surface condition. Keywords: Active Construction, US Highways
Folder US 40 Colfax Ave between Kipling St and Sheridan Blvd
Resurfaces approximately three miles of US 40 in asphalt. Keywords: Active Construction, US Highways
Folder US 40 Steamboat
The Colorado Department of Transportation is working on the resurface US 40 from just north of the 13th Street south to just past 3rd Street with concrete. This is the most heavily traveled section of US 40 in Northwest Colorado and it is several years overdue for resurfacing; additionally, for improved pedestrian and mass transit safety, new features are being installed with this project. Keywords: Active Construction, US Highways
Folder US 40/US 287 at Boyero
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways
Folder US 50 east of Pueblo
Resurfaces six miles of US 50 and makes some other improvements. Keywords: Active Construction, US Highways
Folder US 85 between Titan Road and Cook Ranch
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders. Keywords: Active Construction, US Highways
Folder US 160 - Alamosa East
Resurfaces six miles of US 160 in asphalt. Keywords: Active Construction, US Highways
Personal tools