Personal tools
Sections
Home : Projects : SH 21 Bridges
Bookmark and Share

Skip to content. | Skip to navigation

SH 21 (Powers Boulevard) Bridges

The SH 21 (Powers) New Bridges over Briargate, Union, and Pinecreek project consists of placing six superstructures on SH 21 using a Design Build project delivery method.  All six superstructures are FIR (Field Inspection Review) level designed.  Currently, there are no structures over Briargate, Union, and Pinecreek, however, all the ramps are built with signalized intersection for these locations.

Structures at Briargate:  I-17-KG (North Bound) and I-17-KH (South Bound)
Structures at Union:  I-17-KV (NB) and I-17-KW (SB)
Structures at Pinecreek:  I-17-KX (NB) and I-17-KY (SB)

 

Project Contact

Mark Andrew
CDOT Resident Engineer
E-mail address: Mark.Andrew@state.co.us
Phone number: (719) 227-3205

Yun Han
CDOT Project Manager
E-mail address:  Yunsu.Han@state.co.us
Phone number: (719) 227-3242

Office address: 
1480 Quail Lake Loop Road, Suite A
Colorado Springs, CO 80906