Bent County Courthouse
-
Historic restoration through Town Square including streetscaping, sidewalks and landscaping. Keywords: Active Construction
-
Big Timbers Transportation Museum
-
Designs and constructs a transportation museum. Keywords: Active Construction
-
Clear Creek County Bakerville to Loveland Recreational Trail
-
Paves 2.88 miles of the existing 4.88 mile trail in asphalt. Keywords: Active Construction
-
I-70 between Vail Pass and Silverthorne
-
Resurfaces 14 miles of I-70 from milepost 190 to 204 as well as the right lane of eastbound I-70 between milepost 180 and 190. Numerous bridges along the I-70 corridor will also be rehabilitated by repairing expansion joints and bridge decks. Keywords: Active Construction, Interstates
-
I-70 West, Truck Parking Management
-
Installs various truck parking management components (electronic signs, closed-circuit cameras, power and communications systems), as identified in the I-70 Mountain Corridor PEIS, to provide notification during inclement weather.. Keywords: Active Construction, Interstates
-
John Rawlings Heritage Center
-
Historic restoration by construction sidewalks, landscaping, signage and parking lot rehabilitation. Keywords: Active Construction
-
Platte River Pedestrian Bridge and Bicycle Path
-
Resurfaces seven miles of the Platte River pedestrain/bicycle path. Keywords: Active Construction
-
Pueblo Eastern Gateway Landscape
-
Landscaping and irrigation installation for the Eastern Gateway Landscape project located at the intersection of US 50B and SH 47. Keywords: Active Construction
-
State Highway 9 between Valley Brook and Coyne Valley in Breckenridge
-
Widens SH 9 to two lanes in each direction and constructs a new pedestrian bridge and a retaining wall. The project will also relocate a bike path and improve drainage. Keywords: Active Construction, State Highways
-
State Highway 9 Frisco to Breckenridge
-
The Colorado Department of Transportation (CDOT) is widening State Highway (SH 9) corridor from two to four lanes. This will increase safety and mobility of drivers, transit, pedestrians and bicyclists. Improvements have been steadily taking place since the SH 9 Environmental Impact Statement and Record of Decision have been signed by CDOT and the Federal Highway Administration (FHWA). Keywords: Active Construction, State Highways, Studies, State Highways
-
State Highway 119 Main Street South
-
Keywords: Active Construction, State Highways
-
Union Pacific Railroad Roundhouse
-
Restores the roundhouse to become a railroad museum. Keywords: Active Construction
-
US 24 west of Limon
-
Resurfaces 10.8 miles of US 24 in asphalt. Keywords: Active Construction, US Highways
-
US 40/US 287 at Boyero
-
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways
-
US 85 between Titan Road and Cook Ranch
-
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders. Keywords: Active Construction, US Highways
-
US 285 at Shaffers Crossing
-
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways