Central/Eastern Colorado

Centeral/Eastern Colorado - Region 1 Active Construction

Folder Bent County Courthouse
Historic restoration through Town Square including streetscaping, sidewalks and landscaping. Keywords: Active Construction
Folder Big Timbers Transportation Museum
Designs and constructs a transportation museum. Keywords: Active Construction
Folder Clear Creek County Bakerville to Loveland Recreational Trail
Paves 2.88 miles of the existing 4.88 mile trail in asphalt. Keywords: Active Construction
Folder I-70 between Vail Pass and Silverthorne
Resurfaces 14 miles of I-70 from milepost 190 to 204 as well as the right lane of eastbound I-70 between milepost 180 and 190. Numerous bridges along the I-70 corridor will also be rehabilitated by repairing expansion joints and bridge decks. Keywords: Active Construction, Interstates
Folder I-70 West, Truck Parking Management
Installs various truck parking management components (electronic signs, closed-circuit cameras, power and communications systems), as identified in the I-70 Mountain Corridor PEIS, to provide notification during inclement weather.. Keywords: Active Construction, Interstates
Folder John Rawlings Heritage Center
Historic restoration by construction sidewalks, landscaping, signage and parking lot rehabilitation. Keywords: Active Construction
Folder Platte River Pedestrian Bridge and Bicycle Path
Resurfaces seven miles of the Platte River pedestrain/bicycle path. Keywords: Active Construction
Folder Pueblo Eastern Gateway Landscape
Landscaping and irrigation installation for the Eastern Gateway Landscape project located at the intersection of US 50B and SH 47. Keywords: Active Construction
Folder State Highway 9 between Valley Brook and Coyne Valley in Breckenridge
Widens SH 9 to two lanes in each direction and constructs a new pedestrian bridge and a retaining wall. The project will also relocate a bike path and improve drainage. Keywords: Active Construction, State Highways
Folder State Highway 9 Frisco to Breckenridge
The Colorado Department of Transportation (CDOT) is widening State Highway (SH 9) corridor from two to four lanes. This will increase safety and mobility of drivers, transit, pedestrians and bicyclists. Improvements have been steadily taking place since the SH 9 Environmental Impact Statement and Record of Decision have been signed by CDOT and the Federal Highway Administration (FHWA). Keywords: Active Construction, State Highways, Studies, State Highways
Folder State Highway 119 Main Street South
Keywords: Active Construction, State Highways
Folder Union Pacific Railroad Roundhouse
Restores the roundhouse to become a railroad museum. Keywords: Active Construction
Folder US 24 west of Limon
Resurfaces 10.8 miles of US 24 in asphalt. Keywords: Active Construction, US Highways
Folder US 40/US 287 at Boyero
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways
Folder US 85 between Titan Road and Cook Ranch
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders. Keywords: Active Construction, US Highways
Folder US 285 at Shaffers Crossing
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects. Keywords: Active Construction, US Highways